Read the quantity list

You know what every row and column stands for, and what the waste allowance does to the total.

Quantities and price5 min8 steps
  1. 1

    Find the list in the panel on the right

    The heading is Quantity list and it sits in the panel to the right of the drawing. On a narrow screen the panel is below the drawing, so scroll down.

    The price list: upload the CSV and check the columns in the preview.
    The price list: upload the CSV and check the columns in the preview.

    Worth knowing. In Full screen the panel is hidden. Move the mouse towards the right edge of the screen and it slides out.

  2. 2

    Set the scale if the lengths are missing

    If it says Lengths appear once you have set the scale, the drawing has no scale yet. Click Scale in the tool rail and measure up a distance you know.

    Worth knowing. The scale carries through to every single length. Type 10 m for something that is really 12 and the whole list comes out 17 % short, and the quote just as much too cheap.

  3. 3

    Read a row

    A row is a combination of service, size and material. S160 · PVC is all the foul water in 160 PVC in the whole project, no matter how many lines you drew or on which sheet.

  4. 4

    Compare the columns Measured, Waste and Total

    Measured is what you have drawn. Waste is the addition from the waste allowance. Total is Measured plus Waste, and that is the figure you order on.

  5. 5

    Check the Total row

    The bottom row sums all the runs. If the sum looks unreasonable it is almost always a run drawn twice or a scale that is wrong, not the list.

  6. 6

    Read the separate sections under the table

    Areas shows area in m² and volume in m³. Objects counts chambers, bends and junctions. Counts are your own tallies and Transitions are the size changes. Each section only turns up once you have measured something that belongs in it.

  7. 7

    Set the waste allowance

    The box Waste allowance sits under the table. Type the percentage in the field, or press +0 %, +5 % or +10 %. A new take-off starts at 5 %.

    Worth knowing. The waste allowance is only counted on the lengths of the runs, not on areas and not on the number of objects. 5 % on 400 m gives 20 m of extra pipe, but zero extra square metres and zero extra chambers.

  8. 8

    Count on the quote pricing Total

    The quote and every export use the column Total, not Measured. Raise the waste allowance from 5 % to 10 % and the sum in the quote goes up straight away.

Next steps

Do the steps on a real drawing

Open the tool and follow the walkthrough on the sample drawing that is already there. No login needed.

Open the tool

Stuck on a step? Get in touch and we will gladly look at your drawing.